For Release: On Receipt
End Date: Wednesday, 27 January 2021 @ 4:00 PM
Editor’s
note: Customers,
may view this power outage information on GPA’s
Facebook page.
Editor’s
note: Customers,
may view this power outage information on GPA’s
Facebook page.
Re: Scheduled Power Outage Notice
GPA ANNOUNCES SCHEDULED POWER OUTAGE – Tumon Area
The Guam Power Authority advises that a power outage is scheduled as follows:
Re: Scheduled Power Outage Notice
For Release: On Receipt
End Date: Wednesday, 13 January 2021 @ 3:00 PM
GPA ANNOUNCES SCHEDULED POWER OUTAGE – Route 1 Tumon
The Guam Power Authority advises that a power outage is scheduled as follows:
Wednesday, 13 January 2021
From:
9:00 AM – 3:00 PM (6 hours)
The area(s) affected include: Route 1 Traffic light, Tasi 17, Bayview Hotel, Oceanview Hotel, Tagada Guam, Pacific Place; and customers within the surrounding areas.
REASON: GPA crews will be performing maintenance work and repairs to improve power quality.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
For Release: On
Receipt
End Date: 28
December 2020 @ 12:00 PM (Noon)
GPA
ANNOUNCES SCHEDULED POWER OUTAGE – Barrigada-Tiyan Area
The
Guam Power Authority advises that a power outage is scheduled as follows:
Monday,
28 December 2020
From
09:00 AM – 12:00 PM Noon (3 hours)
The
area(s) affected include: Barrigada: Tiyan Area-Core Tech School Building
REASON:
GPA
crews will be performing maintenance work to improve power quality.
Customers
using backup generators, please ensure your main breaker is in the OPEN
position to ensure the safety of the GPA crews working on the lines.
GPA
regrets the inconvenience caused to customers in these areas, but the outage is
necessary as a safety precaution while the GPA crews are performing this work.
Your
cooperation is appreciated.
# # #
Editor’s note: Customers, may view this power
outage information at guampowerauthority.com or on GPA’s Facebook page.
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 10 December 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 10 December 2020
From 8:30 a.m. – 2:30 p.m. (5.5 hours)
The area(s) affected include areas of Ordot along Chalan Famha and customers on the left side of the "Y" intersection and the surrounding locations.
Residents before the "Y" Intersection will experience a one (1) hour interruption of service beginning at 8:30 a.m.
REASON: Line crews will be conducting maintenance to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Friday, 11 December 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Friday, 11 December 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected are areas of Yigo to include Takano Subdivision after Jesus Amparo Street and customers in these surrounding locations.
In addition, there will be two (2) 30-minute service interruptions. The first at 8:00 a.m. and the second at 2:30 p.m. Areas affected will be all of Takano Subdivision and Jesus Amparo Street to Wendy Lane.
REASON: Line crews will be performing maintenance work to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience is appreciated.
# # # # #
Re: Scheduled Interruption of Service Notice
For Release: On Receipt
End Date: Friday, 4 December 2020 @ 11:00 a.m.
The Guam Power Authority advises that a scheduled interruption of service outage notice has been issued as follows:
Friday, 4 December 2020
From 10:30 a.m. – 11:00 a.m. (30 minutes)
The area(s) affected include areas of Chalan Pago, along with customers off of Rt.4 from the Old Gogue Store towards the Rt.4/ Rt.10 intersection and customers in these surrounding locations.
REASON: Line crews will be changing out defective line hardware to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Wednesday, 9 December 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Wednesday, 9 December 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include areas of Tumon along Fiesta Hotel, Tatuhan Tasi Lane, Haya Lane, Guma Trankilidat, and customers in these surrounding locations.
REASON: Line crews will be performing maintenance work to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Tuesday, 1 December 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Tuesday, 1 December 2020
From: 9:00 a.m. – 2:30 p.m. (5.5 hours)
The area(s) affected include areas of Santa Rita from Simpson are, Buena Vista Drive, Bishop Baumgartner Street, and customers in these surrounding locations.
REASON: Line crews will be on poles, lines and equipment to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # #
Re: Rescheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 3 December 2020 @ 12:00 a.m.
The Guam Power Authority advises that a rescheduled local outage notice has been issued as follows:
Thursday, 3 December 2020
From 8:00 p.m. – 12:00 a.m. (4 hours)
The area(s) affected include areas of Tamuning from Hafa Adai Exchange, TakeCare Clinic, IT Building Bldg., Coast 360 location, and customers in these surrounding locations.
REASON: Line crews will be conducting maintenance to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Wednesday, 25 November 2020 @ 4:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Wednesday, 25 November 2020
From 2:00 p.m. – 4:30 p.m. (2.5 hours)
The area(s) affected include areas of Mangilao along the south fence line of Adacao Elementary School in Latte Heights and customers in these surrounding locations.
REASON: Line crews will be conducting maintenance to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Friday, 27 November 2020 @ 12:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Friday, 27 November 2020
From 8:30 a.m. – 12:30 p.m. (4 hours)
The area(s) affected include areas of Tumon along Guam Plaza Hotel, Outback Steakhouse, Capital Hill, RC Tours, Pia Hotel, Chichirica Lane, Rivera Lane, Bisita Lane, Nikko Hotel, Lotte Hotel, Tsubaki Tower, Gun Beach and customers in these surrounding locations.
REASON: Contractor line crews will be working on new underground lines to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
Re: CANCELLED Scheduled Local Outage Notice
For Release: On Receipt
End Date: Monday, 23 November 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been CANCELLED:
Monday, 23 November 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include areas of Tumon along Fiesta Hotel, Tatuhan Tasi Lane, Haya Lane, Guma Trankilidat, and customers in these surrounding locations.
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 5 November 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 5 November 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include areas of Tumon along Lotte Hotel, Tsubaki Hotel, Nikko Hotel, Nikko Apts, Foxy Building, Gubnand customers in these surrounding locations.
REASON: Line crews will be working on maintenance to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 29 October 2020 @ 3:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 29 October 2020
From 8:30 a.m. – 11:30 ap.m. (3 hours)
The area(s) affected include areas of Santa Rita along Apra Vista Court and customers in these surrounding locations.
REASON: Line crews will be working on maintenance to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 22 October 2020 @ 3:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 22 October 2020
From 12:30 p.m. – 3:30 p.m. (3 hours)
The area(s) affected include areas of Ordot Chalan Pago along Sgt. Pete Cruz Street and customers in these surrounding locations.
REASON: Line crews will be working on relocating poles to accommodate road widening and to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding are appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Wednesday, 14 October 2020 @ 12:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Wednesday, 14 October 2020
From 8:30 a.m. – 2:30 p.m. (4 hours)
The area(s) affected include: Areas of Tumon along Guam Plaza Hotel, Outback Steak House, Capital Hill Hotel, RC Tours, Pia Hotel, Chichirica Lane, Rivera Lane, Bisita Lane and customers in these surrounding locations.
REASON: Line crews will be working on underground lines to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 8 October 2020 @ 11:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 8 October 2020
From 11:00 p.m. – 11:30 p.m. (.5 hours)
The area(s) affected include: Areas of Dededo Southbound along Route 1, right side to Dededo Village and Kaiser areas, Maria Ulloa Elem. School, VSA Benavente Middle School, Wettengel Elem School, Santa Barbara School and customers in these surrounding locations.
REASON: Line crews will be working on performing maintenance work to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 8 October 2020 @ 2:00 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 8 October 2020
From 9:00 a.m. – 2:00 p.m. (5 hours)
The area(s) affected include: Areas of Mangiloa along Manga Road and customers in these surrounding locations.
REASON: Line crews will be working on performing maintenance work to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 8 October 2020 @ 3:00 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 8 October 2020
From 9:00 a.m. – 3:00 p.m. (6 hours)
The area(s) affected include: Areas of Hagatna along West O'Brien Drive, Padre Palomo Street, Chalan Santo Papa, GWA Hagatna Sewage Treatment Plant, Murray Road, and customers in these surrounding locations.
In addition, there will be a brief 30 minute interruption of service at 9:00 a.m. and again at 3:00 p.m. Areas affected will be areas of West O'Brien Drive.
REASON: Line crews will be providing work clearance for Navy contractors working on power lines.
The outage is necessary for contractor line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 1 October 2020 @ 1:30 a.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 1 October 2020
From 12:00 a.m. – 1:30 a.m. (1.5 hours)
The area(s) affected include: Areas of Asan/Maina and parts of Anigua from 76 Service Station towards Pigo Cemetary, Asana and Maina Village and customers in these surrounding locations.
REASON: Line crews will be working on performing maintenance work to improve power quality and reliability
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 8 October 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 8 October 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include: Areas of Tumon along Fiesta Hotel, Tatuhan Tasi Lane, Haya Lane, Guma Trankilidat location and customers in these surrounding locations.
REASON: Contractor line crews will be working on new underground lines to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Friday, 25 September 2020 @ 5:00 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Friday, 25 September 2020
From 2:00 p.m. – 5:00 p.m. (3 hours)
The area(s) affected include: Areas of Yigo along parts of Wusstig Road, Chalan Pasifico, GHURA-505 (Mapola Loop), Chalan Despasiu, Pasencia Street, Chalan Adahi, Chalan Estuba, Gobu Drive, Chalan San Halum, Kayen Cheton, Chalan Bonita, Kayen Tan Lole and customers in these surrounding locations.
REASON: Line crews will be performing maintenance work to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 24 September 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 24 September 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include: Areas of Tumon along Foxy Building, Nikko Hotel, Tsubaki Hotel, Lotte Hotel, Gun Beach location and customers in these surrounding locations.
REASON: Line crews will be working on new underground lines to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 24 September 2020 @ 12:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 24 September 2020
From 8:30 a.m. – 12:30 p.m. (4 hours)
The area(s) affected include: Areas of Tumon along Guam Plaza Hotel, Outback Steakhouse, Capital Hill, RC Tours, Pia Hotel, Chichcirica Lane, Rivera Lane, Bisita Lane and customers in these surrounding locations.
REASON: Line crews will be working on new underground lines to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Emergency Outage Notice
For Release: On Receipt
End Date: Thursday, 3 September 2020 @ 11:00 a.m.
The Guam Power Authority advises that an emergency local outage notice has been issued as follows:
Thursday, 3 September 2020
From 9:00 a.m. – 2:00 p.m. (5 hours)
The area(s) affected include: Areas of Yigo in Pacific Latte Estates and customers in these surrounding locations.
REASON: Line crews will be making repairs to line hardware equuipment to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Thursday, 3 September 2020 @ 2:00 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Thursday, 3 September 2020
From 9:00 a.m. – 2:00 p.m. (5 hours)
The area(s) affected include: Areas of Yigo along Chalan Islan Marianas, Chalan Islas Guahan, Islas Court and customers in these surrounding locations.
REASON: Line crews will be upgrading and installing additional power lines for future development to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Wednesday, 2 September 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Wednesday, 2 September 2020
From 8:30 a.m. – 2:30 p.m. (6 hours)
The area(s) affected include: Areas of Tumon by Foxy Building, Nikko Hotel, Tsubaki Hotel, Lotte Hotel, Gun Beach and customers in these surrounding locations.
REASON: Line crews will be performing maintenance work to improve power quality and reliability.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.
Your patience and understanding is appreciated.
# # # # #
Re: Scheduled Local Outage Notice
For Release: On Receipt
End Date: Tuesday, 18 August 2020 @ 2:30 p.m.
The Guam Power Authority advises that a scheduled local outage notice has been issued as follows:
Tuesday, 18 August 2020
From 9:00 a.m. – 2:30 p.m. (5.5 hours)
The area(s) affected include: Areas of Malesso along inner portion of Quinene Road, Champaco area and customers in these surrounding locations.
REASON: Line crews will be clearing vegetation off power lines.
The outage is necessary for line crews will be performing work on power lines or power line hardware(s).
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while line crews are performing this work.